From our sites
Photos and short videos from our construction, groundworks, and mechanical and electrical work across Abuja and Rivers State.
Showing all 79
-
Finished terrace duplex
-
Two-storey concrete frame with formwork in place
-
Two cranes positioning a storage tank
-
Raft foundation reinforcement across the full slab
-
Bungalow shell complete, with paved surrounds
-
Fire pump sets with their control panels
-
Timber formwork for a lintel beam on blockwork
-
Pipework installation on scaffolding inside an industrial plant
-
Pipe laid in a trench, ready for backfilling
-
Interior door fitted during finishing works
-
Site meeting on a plant platform
-
Bungalow plastered, with external works set out
-
Cable pulling on a raised steel platform
-
Block-lined drainage channel under construction
-
Concrete paving across the compound
-
Reviewing drawings on an excavated site
-
Two-storey building with scaffolding up for plastering
-
Excavation around pipework at a metering station
-
Motor grader shaping an access road
-
Roller compacting the site
-
Engineers checking plans on site
-
Wall reinforcement with the basement slab beyond
-
Grader levelling the site
-
Paved yard with the pavilion beyond
-
Engineers setting out on a cleared site
-
Checking a fire pump installation
-
Borehole drilling rig at work
-
Finished kitchen with island and feature lighting
-
Commissioning team at a water treatment unit
-
Timber roof trusses on a blockwork bungalow
-
Basement wall reinforcement in place
-
Control panel of a water treatment system
-
Excavator clearing and stripping the site
-
Decorative entrance gate installed
-
Project team in the pump house
-
Foundations complete and filled, ready for the floor slab
-
Reverse-osmosis membrane housings in a water treatment plant
-
Foundation trenches set out
-
Site team on a slab
-
Hardcore laid and formwork going in
-
Estate road graded, with aggregate stockpiled
-
Interior ceiling works in progress
-
Bulldozer clearing the site
-
Survey team with a levelling instrument
-
Reinforcement and formwork for a concrete base
-
Storage tank lifted between two cranes
-
Fence posts set out on a cleared plot
-
Engineers on slab reinforcement before the pour
-
Roof trusses with roofing sheets going on
-
Storage tank checked on delivery
-
Foundation blockwork with trenches open
-
Site supervision on a reinforced slab
-
Water treatment equipment delivered to site
-
Columns and beam formwork on the frame
-
Transformers installed at a residential estate
-
Preparing to concrete the basement walls
-
Two-storey blockwork shell
-
Sectional water tank with its feed pipe
-
Terrace houses with scaffolding for plastering
-
Checking the base of a steel tower
-
Inspecting a roof slab and parapet blockwork
-
Fire pump room installation
-
Suspended slab formwork and reinforcement
-
Transformer substation installation
-
Casting a ground-floor slab
-
Basement raft reinforcement in the excavation
-
Basement wall formwork and propping
-
Concreting the ground slab over compacted hardcore
-
Hardcore filled and edge formwork set for the floor slab
-
Walkthrough of slab reinforcement with electrical conduits in place
-
Basement walls cast, with slab formwork going up
-
Inspecting slab reinforcement and conduits
-
Blockwork rising on a three-storey building
-
Reinforcement and formwork for a basement wall
-
Slab reinforcement ready for concrete
-
Pad foundations being excavated and cast
-
Residential block at plastering stage
-
Basement walls and compartments formed
-
Glazed facade nearing completion
Have a site in mind?
Tell us about the land, the brief and the budget, and we’ll get back to you to talk it through.